OBJECTIVES

  • DRILL A VERTICAL WELL DOWN TO THE REPOSITORY ZONE AND THEN A  SERIES OF HORIZONTAL LATERALS INTO THE
  • SELECTED ZONES.
  • PREPARE THIS SET OF WELLBORES OR “MINI-TUNNELS” FOR DEPLOYMENT OF THE WASTE CONTAINERS.
  • Specialized Drilling Rig
  • Drill Vertical wellbore down to storage zone
  • Drill multiple lateral sections of storage segments of the well.
  • Prepare the wellbore by installation of steel casing and cemented sheath
  • Prepare for Installation of the nuclear capsule.
  • Prepare wellhead for maintenance and security

  • 3 D SEISMIC
  • STEERABLE DRILL BITS
  • HIGH CAPACITY RIGS
  • MULTI-LATERAL TECHNOLOGY
  • BOREHOLE TELEMETRY – (RADAR)
  • GEO-NAVIGATION (GPS)
  • MODERN SAFETY SYSTEMS (BOPS)
  • INTERNET TECHNOLOGIES
  • REMOTE INFORMATION PROCESSING